0

Out of 0 Ratings

Owner's of the APC Computer Accessories Apc Switched PDU gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 186
 
®
USER’S GUIDE
Switched Rack PDU
51
How to schedule an outlet event
1. From the menus of the Web interface, select Switched Rack PDU and
then Scheduling.
2. On the Outlet Scheduling page, select how often the event will occur:
Daily, Weekly, or One-Time.
3. On the scheduling page, in the Name of event text box, replace the default
name, Outlet Event, with a name that will identify your new event.
4. Use the drop-down lists to select the type of event and when it will occur.
5. Use the check-boxes to select which outlets will be affected by the
action. You can select one or more individual outlets or All Outlets.
6. Click Apply to confirm the scheduling of the event, or Clear to cancel it.
When you confirm the event, the summary page is re-displayed, with the
new event displayed in the list of scheduled events.
If you select Weekly, you can choose to have the event occur
once every week or once every two, four, or eight weeks.
The date format for one-time events is mm/dd, and the time
format for all events is hh/mm, with the two-digit hour
specified in 24-hour time.
An event that is scheduled daily or at one of the intervals
available in the Weekly selection continues to occur at the
scheduled interval until the event is deleted or disabled.
You can schedule a one-time event to occur only on a
date within 12 months of the date on which you perform
the scheduling. For example, on June 4, 2004, you could
schedule a one-time event on any date from the current
date until June 3, 2005.