0

Out of 0 Ratings

Owner's of the Broan Ventilation Hood EI5936SS gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 32
 
MODEL EI5936SS
Page 4
INSTALL THE HOOD (Ducted hoods only - Steps 1 & 2)
NON-DUCTED HOOD INSTALLATION - SKIP TO STEP 3.
1. Determine length L” of frame assembly based upon desired
installation height. (See chart below.) To adjust frame
assembly height, remove (8) screws, slide upper frame
assembly to required height, replace screws and tighten
securely.
LENGTH
“L”
2. Align frame assembly to ceiling framing, and attach to ceiling
framing with (6) 4mm x 50mm screws. Tighten securely,
making sure that the upper frame bracket is tight against the
ceiling.
DUCTED HOOD INSTALLATION - SKIP TO STEP 9.
24" 25" 26"27" 28" 29" 30" 31" 32" 33" 34" 35" 36"
Ceiling
Height
8 Feet 19-5/8” 18-5/8” 17-5/8” 16-5/8” 15-5/8”
9 Feet * 23-5/8” * 22-5/8” * 21-5/8” * 20-5/8”
9 Feet
with
FXNE59SS
32-5/8" 31-5/8" 30-5/8" 29-5/8" 28-5/8" 27-5/8" 26-5/8"
10 Feet
with
FXNE59SS
44-5/8"43-5/8"42-5/8"41-5/8"40-5/8" 39-5/8" 38-5/8" 37-5/8" 36-5/8" 35-5/8" 34-5/8" 33-5/8" 32-5/8"
* Non-duct recirculation louvers will be exposed in ducted configuration
Desired Hood Distance (Above 36" High Cooktop)
Frame Length “L”
* 20-5/8"
FRONT
CEILING
MATERIAL
IS INSTALLED.
CEILING
FRAMING
ABOVE -
SHOWN
AS DOTTED
LINES.